Installation

Main steps of processing:

Drafting

Edge cutting

Bonding

Sand infill

Clay infill

Watering

Placement of playing lines

Rolling

Game, set, match!

With about only 28 mm you can convert any existing court into a red plus court

Types of surfaces:

  • On existing mateco court
  • On existing resin court
  • On existing binder court
  • On new stone and gravel foundation
  • On existing concrete foundation
  • On existing red clay court
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.